THE ELECTRICITY (PRIMARY GRID CODE) REGULATIONS, 2003

This Code provides the guidelines and procedures for the licensees’ of the electric power system to operate the Uganda power system. This Code contains rules and procedures for the efficient management of the electric supply industry in Uganda, taking into account a wide range of operational conditions that are likely to be encountered under normal and exceptional circumstances. This Code shall be administered by the Uganda Grid Code Committee (the “Committee”) who shall be empowered by the Electricity Regulatory Authority (“ERA”) under section 14 of the Act, while ERA is empowered to make final decisions on amendments of this Code in consultation with the Committee.

Eskom Uganda Limited adheres to this code fully. Download Act